Posts Tagged green demolition

Summer Kicked-Off with a Carport Deconstruction – Notes From the Field

by Ryan DeSales, Seattle Field Crew Member

Summer is here! And that means that the weather is perfect for barbeques, the beach, and even deconstructing a carport. Yes, a carport. At least that’s what The RE Store’s Seattle field crew did on its summer vacation.

field crew deconstructing

You may already know that The RE Store will pick up and/or salvage your reusable building materials for free in the greater Puget Sound area. But did you know that we also offer green demolition services for select projects? The goal of green demolition (or “deconstruction”) is to salvage as much reusable material as possible, while mitigating waste and environmental impact.

With these goals in mind, an aging carport in Seattle’s Wallingford neighborhood became the perfect candidate for summer deconstruction. We started from the top by stripping off the old torch-down tarpaper roofing; incidentally, this was the only real waste created during the entire project. Next, we pulled the plywood sheathing from the rafters and then removed and lowered the rafters themselves onto our trusty truck Possum.

I should mention that we parked Possum (one of our trusty flat-bed trucks) directly under the carport and worked from it like a scaffold. This provided a stable work platform and allowed us to load salvaged materials immediately upon removal. This is not the first time that Possum has served as part scaffold and part workbench. We even roped the carport’s vertical support beams directly to Possum’s side gates to keep the structure stable as we pulled it apart (MacGyver would be proud).

possum the truck as scaffolding

Surprisingly, most people don’t like to buy lumber that’s full of nails and staples. Thus, we typically “de-nail” all lumber onsite and this carport deconstruction was no exception. Larger nails must be removed the old fashioned way with pry bars or hammers. Smaller nails, however, can be extracted with a pneumatic nail-kicker. The nail kicker is essentially a reengineered nail gun that is placed on the point end of a nail to shoot it free of the work piece.

With the exception of a circular saw to cut a few beams down to length, we deconstructed the entire carport with hand tools and elbow grease. From start to finish, the process took five people approximately four hours, and it yielded twenty sheets of plywood, twenty-five 2”x10”x18’ boards, four 6”x6”x10’ posts, and an assortment of smaller lumber. We recycled all unsellable materials, such as old aluminum rain gutters, flashing, and the pounds of removed nails and others fasters.

loose beams ready for The RE Store

The RE Store’s green demolition services are well suited to standalone structures, such as garages, carports, sheds, and similar outbuildings. These types of structures can be dismantled efficiently with person power and hand tools and typically yield less waste. As an added bonus, green demolition of such buildings creates a supply of quality, reduced-cost building materials for re-consumption by the public.

Contact our crews in Seattle or Bellingham here:  http://re-store.org/contact-us/

Posted in: Notes From the Field, Stories about people, Stories about stuff

Leave a Comment (2) →

New Arrival – A Trusty Steed for Seattle Operations

2013-new-blue-box-truck1-webIts a boy, no wait, its a girl, no, its a diesel box truck with a lift gate! We have concluded our Truck Fund Raising Campaign that has been going since November of 2012. The new box truck with a lift gate is now serving us well in the Seattle operations. Of course, it is a used vehicle. It even came in a shade of blue. The new truck’s name is still pending but we welcome this beast of burden to the RE family.

This is huge – giving us a more reliable truck fleet to better serve you and communities throughout Washington State. Our salvage crews come to your job site, home, business, storage space or your grandpa’s crazy old barn to pick up and salvage materials. These busy bees visit over 1200 job sites each year. If the trucks break down, the crews end up wasting time and money, losing efficiency and materials. 2013 new blue box truckThat takes away from the 5 million pounds of material that The RE Store diverts every year from being wasted. Those materials also save you money when you go to buy supplies for your remodel, decoration or art project.

We have been helping transform the building industry’s practices that generate one-quarter of all trash in the U.S.. Our crews are the back up that contractors need to reduce disposal fees on job sites, saving supplies to be reused. This is how we have created our jobs at The RE Store from what would have been garbage. This is how we are moving the reuse revolution forward.

And we thank you for your help.

 

Posted in: Green business, Notes From the Field, Stories about stuff, Things you never knew about The RE Store, Transforming the building industry

Leave a Comment (0) →

Building Deconstruction, Green Demolition and Decon ’13

State Street warehouse seriesIf someone asked you what deconstruction is, would you respond:

  1. A complex philosophical movement about meaning that started in France in the 1960’s
  2. A new way of salvaging construction supplies from structures that are being demolished
  3. The age-old method of recovering useful building materials from an existing building

If you answered 3, you are correct. The Roman Empire dismantled and reused ancient Egyptian architectural elements and other building materials over 2000 years ago. They repurposed construction supplies, known as spolia, from throughout the many lands they conquered. Building deconstruction has become a movement in North America over the last 2 decades. The top five reasons are:

  1. Green building has become well-documented as a wiser way to build and remodel structures for all types of use
  2. Resources and commodities have increased in cost
  3. Waste disposal has become more expensive
  4. Design and decor trends have grown the public interest in reclaimed materials
  5. The “D.I.Y.” movement has become hugely popular across television, radio, print and online channels

Decon 13 logoThe deconstruction movement is spreading as businesses, tool research and development, national conferences and case studies all add fuel to the fire. The deconstruction industry’s largest conference, Decon ’13 is hosted by the Building Materials Reuse Association. The event happens this week in Seattle with a wide range of topics that include:

  • Designing for buildings to be deconstructed
  • Historic preservation
  • Deconstruction work force training and education
  • Use of low-value materials
  • Negotiating and permitting deconstruction projects
  • The RE Store’s REvision Division will present our innovative and award-winning furniture building program

You would be hard pressed to find a better source of information, best practices, great networking and much more. Come and be a part of the movement this week, whether you are a builder, architect, demolition contractor, salvager, government project manager, politician or average joe working to stay abreast of the latest building industry trends. The RE Store has over 13 years of experience taking down buildings, including case studies on our website. Contact us today for a bid on your project. What topics would you like to learn about, in regards to deconstruction?

Posted in: Green business, Reference and resources, Stories about contractors, Stories about people, Stories about stuff, Transforming the building industry, You can do it yourself

Leave a Comment (0) →

Notes From the Field – a Window of Opportunity and a Stairway to Heaven

The RE Store’s Seattle field crew is accustomed to being under the gun. On a typical day we juggle multiple salvage jobs and/or material pickups across the Puget Sound area. Our schedule is constantly changing to accommodate the priorities of the homeowners, contractors and other organizations whose donations keep us rolling. This means that we’re often the last out of a building that’s set for demolition, but sometimes, we’re lucky enough to be inside of it while it’s being torn down.

windows minutes before demo

That was the case earlier this January when we were given a narrow “window” of opportunity to salvage, well, windows from a historical Broadmoor mansion. We knew we had to work quickly because the home was slated for demolition the following day. What we didn’t know, however, was that a Caterpillar excavator would be starting the process as we salvaged windows, doors, and other fixtures simultaneously from the circa 1928 home.

Removing windows under ideal conditions can be a time consuming process depending upon window type, the quality of the installation, and the building’s siding material. This particular salvage, however, went surprisingly quickly. Maybe the time flew due to our habit of singing show tunes while we work, or perhaps it was just the unnerving rumble of the excavator scraping the brick façade off of the house that motivated us. Either way, we managed to salvage around fifty windows and a dozen interior and exterior doors.

spiral stair

Working near heavy equipment isn’t always fun, but you sure do miss it when it’s not around. This is especially true when you have to move a steel spiral staircase the old fashioned way. It’s extra especially true when you have to thread that same staircase around the deck of an indoor pool, and then corkscrew it through a narrow hallway, and then load it onto a truck by hand. That’s right kids; we didn’t even use a furniture dolly.

There’s nothing quite as fine as an orange shag carpet-clad, steel spiral staircase. So, dear reader, you can surely understand why we had to rescue this beauty from its lakefront home in Yarrow Point. Originally, it provided direct access from the master bedroom to the indoor pool below. Once we got it situated in the store’s back lot, yours truly and the rest of the field crew had the pleasure of reloading this shaggy spiral gem on the truck (by hand) and delivering it.  She now has a new home at the Ballard based Four Freedoms Liquor Company. And thus the spiral is complete.

Notes by Ryan DeSales, Seattle Field Crew member

Posted in: Notes From the Field, Stories about stuff

Leave a Comment (0) →

Entrepreneurs needed for construction and demolition waste

Trackhoe eating houseIt is time for you to get out your entrepreneurial hat. Imagine tons of useful construction and demolition waste, sorted and available by the truck load. What can you dream up in the way of fabulous new products that help our dear citizenry? The supply is about to increase because the City of Seattle is shooting for the moon, aiming to reduce the mountain of waste sent to landfills by 50,000 to 100,000 tons annually.

In 2007, Seattle adopted it’s Zero Waste Strategy to help revolutionize waste disposal and recycling in two main channels of the river of waste that flows from the Emerald City: construction & demolition waste (C & D) and food waste. Additional disposal bans have been put in place, including concrete, brick and asphalt paving in January of this year. On December 10, 2012, Seattle City Council took the next step with ordinance #124076.

As of January of 2015, it will be prohibited to dispose of metal, cardboard, carpet, plastic film wrap, and new gypsum scrap (dry wall) in dumpsters or at the city’s transfer stations. The new ordinance establishes “a construction waste recycling facility certification program; requiring the submittal of waste diversion reports by certain construction and demolition waste generators.”

This isn’t just some crazy idea vetted by green building idealists (like us!), but was assessed as achievable based on assessment modeling and a public review process of the industry stakeholders who would be affected by the changes.

From Richard Conlin’s blog, one of Seattle’s most progressive council members:

“Making this effective requires that facilities cooperate, that markets are available, and that we collect data on what construction projects are actually doing with their waste.  All of these components are built into the program, with provisions for administrative flexibility if there are problems with market development.

The materials that will be included in recycling requirements by 2016 represent more than 80% of the tonnage of waste generated in the construction sector.  Since SPU has forged a cooperative agreement with the businesses involved to make this program work, it is likely that we will be able to attain these goals.”

Dream big because the recycling facilities will be sifting and sorting this stuff by the ton in the next few years. What’s your big or little idea? Come talk to us if you think you have something that could work in the realms of salvage and repurposing.

Posted in: Green business, Stories about stuff, Transforming the building industry

Leave a Comment (0) →

Industrial Demolition Contractors Embrace Reuse and Recycling of Materials

What happens to a 1.2-million-square-foot aluminum plant when skyrocketing energy costs force its doors closed forever?

goldendale plant photo - before and midwayIn the wrong hands, it could become a massive pile of rubble languishing in a landfill. However, when the Goldendale Aluminum Plant in southern Washington shut down in 2003, the owners insisted on hiring industrial demolition contractors who could dismantle the plant with a minimal amount of waste sent to the landfill. That meant thousands of tons of materials – and truckloads of usable equipment – would need to be carefully extracted, sorted, processed and repurposed or recycled.

It was a project J.D. Elder, president of Elder Demolition, had been preparing for since starting the company in 1997. Back then, the contractor specialized in selective demolition of interior commercial spaces. Their previous work involved meticulously picking apart materials in tight urban spaces. Elder invested in state-of-the-art shears and other equipment that offered almost surgical precision.

Owning the right equipment paid off as the company transitioned to total structural demolition of industrial and commercial buildings. For eco-conscious industrial demolition contractors, Oregon offers plenty of green demolition opportunities – and Elder’s crew is often able to reuse or recycle up to 95 percent of a job’s materials. So when the bid for the Goldendale plant came around, they were ready.

Aftermath of Industrial Demolition

The Goldendale Aluminum Plant project was easily the largest job J.D. and his brother, Jeff Elder, had ever undertaken. By the time the contractors finished taking apart, they were left with 147,000 tons of debris, including:

  • 100,000 tons of concrete.
  • 35,000 tons of structural steel.
  • 10,000 tons of aluminum siding, roofing cable, conduit and copper wire.
  • Boilers and other usable equipment.

Concrete crushing at GoldendaleRepurposing Materials from the Goldendale Aluminum Plant

To deal with the 100,000 tons of concrete, Elder’s crew went to work with concrete shears. It took close to six months to remove all the rebar and slice the material into 3-inch chunks for crushing, Jeff Elder said. These were then loaded into the company’s concrete crusher, which chewed them up into gravel. Instead of purchasing new gravel, the Elder brothers reused all of the crushed concrete onsite to level the land – a cost-effective as well as eco-friendly solution. (J.D. Elder notes that the public can buy crushed concrete for half the price of gravel for their own DIY projects.)

There were also truckloads of perfectly functional industrial equipment salvaged from the plant. Ultimately, an entire building’s worth of machinery was sold for reuse. The steel, aluminum, copper, roofing cable and siding were all recycled. In the end, only 2,000 tons of debris went into the landfill – a mere 1 percent of the total demolished materials.

The RE Store’s green demolition and salvage services haven’t ever taken on a project this large, but we have worked with major demolition companies like Nuprecon and others.

Thanks to Elder Demolition for their guest post. Elder Demolition is a fully licensed and insured commercial and industrial demolition company, with certifications for hazardous waste handling as well as broad experience with LEED-certified green demolitions. 

Posted in: Green business, Stories about contractors, Stories about stuff

Leave a Comment (1) →

Meet the Fleet – Trucks, Trailers and Moving Stuff Around

Truck collageWe like to move stuff around just as much as any American. The thing that The RE Store does differently is that each load that we carry on our trucks save precious building materials from the brink of doom by way of landfill or incinerator. It is a lot of work and we love it. Our crews drive over 100,000 miles each year if you combine all six of our trucks that roam throughout Western Washington and occasionally East of the mountains.

We have our weekly “truck love” maintenance schedule that insures our trusty steeds stay watered, fed and in as good a condition as we can keep them. Neither of the Seattle trucks have a lift gate. We use ramps or brute strength to get everything on and off and on and off and on and off every day. The trucks have hauled materials from job sites that include homes, businesses and storage facilities. We carry amazing reuse displays to trade shows or haul our Recycled Art Station to community events. The trucks have even hauled tons of trash picked up from our beach clean-up projects as a part of the annual Recycled Arts Show. We utilize biodiesel in our diesel trucks and work to minimize storm water run off from our job sites.

As is true to our car culture, The RE Store’s fleet of trucks all have their own personalities:

Lily the truckLily is a 2000 Ford F250 Crew Cab pickup with over 133,000 miles.
She is lily-white and is the truck that up to six of our Bellingham crew travels in. Lilly witnesses the most progressive conversations and brainstorms, due to her community-building roomy interior. She also carries lots of tools, but not a huge amount of materials. She loves to pull trailers and heave large timbers on her beefy rack. We wonder if she is a pig at heart, as she gets stuck in the mud all too often with her out-of-commission four wheel drive. Lilly has has spent a lot of time on overnight projects out in the San Juan Islands. Bellingham crew member, Charlie Myers, slept in Lilly’s back seat on a Lopez Island job site for four nights. His tent had collapsed under a downpour, so he made due in Lily.

Herman is a 2006 GMC-Isuzu 12-foot box van with over 137,000 miles.
Herman is the heavy lifter with a lift gate, allowing one crew member to do a lot of work and keep stuff dry. Herman is our workhorse and is the newest member of our fleet. He was an exciting replacement, 2 years ago, for our old open bed pickup, Graywolf. He is named after Mt. Herman that located close to Mt. Baker (big and white). Some of our staff wonder if Herman has a crush on Lily.

Blue truckBlue is a 1997 Chevy 3500 with a 12-foot flatbed, the oldest and most tired of our hard-working Bellingham fleet with a whopping 187,000 miles as of October 2012.
Blue has hauled millions of pounds (seriously) of lumber and large items back from thousands of job sites over the years. You name it, Blue has carried it. We have rebuilt the gates twice that close in the sides out of bleacher boards and rebuilt the bed once, out of salvaged 2×6 tongue and groove decking, all on our own. When Blue’s rear steel gates went missing, former crew member Gabe Gonzalez welded up new ones for us.

Possum, the truckPossum is a white, 2001 Isuzu flatbed with over 120,000 miles on the odometer.
We have had Possum for close to a decade. He was named Possum because a possum was living in the Seattle store that evaded capture for weeks. This trusty steed has hauled from more than 2000 job sites. Every brick load over the last seven years came back to the Seattle store on Possum’s strong back. Possums gates are made out of our bleacher board and the deck currently needs replacement, like Blue received.

Fuso, the truckFuso is a white 1994 Mitsubishi flatbed that we put a dump bed on with 175,000 miles.
Fuso has been the main green demolition / deconstruction truck thanks to the dump bed that we installed after buying it in 2007. 15 or more houses have been deconstructed and hauled back to the store in Fuso. This is our only Seattle truck with a working radio, and it rarely is changed from KEXP or KUOW radio stations. Fuso’s side gates are also built out of our favorite wide-plank lumber material, bleacher boards. These bleacher boards sport a patina that could only be created by decades of wiggling and giggling adololescents during their school assemblies and sports events.

Clutch, the truckClutch is a white 1989 Nissan pickup that was donated to our organization in 2002 with over 160,000 miles now.
Clutch is the scout for our Seattle field services and sees the most mileage of all of our trucks. This old friend previews between 1200 and 1500 jobs. Clutch doesn’t have a working radio, so Clutch hears a lot of Joel, our Seattle field manager, talking to himself. Clutch proudly wears the rack that lived formerly on our previous preview rig, Scout.
Before serving The RE Store, Clutch was used by our parent non-profit, RE Sources, for hauling recycling education materials to hundreds of Whatcom County school classrooms.

Visit our Field Services pages to get a free bid from our Pick-upSalvage Strip-Out, and Green Demolition “Deconstruction” Services

Check out this great examples of alternative transportation in the construction industry with local remodelers, A-1 Builders, in Bellingham, commuting to a major remodel job site via bicycle. Read the article on page 16 of American Bicyclist.

Posted in: Green business, Stories about people, Stories about stuff, Things you never knew about The RE Store, Transforming the building industry, Why blog about The RE Store?

Leave a Comment (0) →

Striking Salvage Gold in Own Backyard – Notes from the Field

by Ryan DeSales, Seattle Field Crew Member

Working on The RE Store’s field crew is a lot like digging for buried treasure. It’s a dirty, dusty, splintery business, and it’s often done at a fever pitch. While we travel to many exotic locales in our never-ending quest for architectural gold, there’s nothing better than striking it rich in our very own backyard.

This September, we unearthed a treasure trove of vertical grain Douglas fir tongue-and-groove flooring just blocks away from our Ballard store location. It was buried deep under a musty layer of avocado green shag carpeting. Thankfully, the previous owner saw past the luxurious fad of that deep pile rug and didn’t bother to tack it down. This single visionary action left the fir beneath it in as good-as-it-gets condition. Eternally thankful, we set to work with our trusty Burke bars in hand (top left in image above).

Unlike today’s wood flooring, which is typically installed with the benefit of pneumatic nail guns, this stuff was done ye old-fashioned way. Imagine if you will, a carpenter setting each nail in each board by hand with a hammer. Every time we pull up a floor of this vintage we give thanks that we weren’t the ones who had to install it. However, removing fir flooring is no picnic either.

Flooring of this type is nailed through the tongue when installed, and it must be removed by prying at each nail from the tongue side. Fir is a soft wood that often becomes brittle with age, so special care must be taken to avoid breaking the tongue upon removal. Take it from someone who knows, breaking the tongue renders the piece unusable again as flooring. Listening to the sound that the board makes during removal is actually one of the best indicators of whether or not it will come out intact. The more screeching nail sounds the better.

After listening to the soothing sounds of the fir floor, we moved on to unearth a number of other treasures from the Ballard house, including: cast iron pedestal sinks, divided light windows, cedar fence boards, and even some Volkswagen Beetle windshields. While our mission is to salvage reusable building materials, we’re always on the hunt for re-purposeable treasures to bring to you, the RE Store supporter. This time around, we managed to dig up pieces of Ballard, which we hope have found new homes by now. The VW windshields, however, are still available as of this writing; please inquire at The RE Store in Seattle for more information.

And remember to give us a call to schedule a free pick up from your renovation or project!  More info here

Posted in: Notes From the Field, Stories about people, Stories about stuff

Leave a Comment (0) →

Mainstreaming Green Demolition and Reuse With Tom Napier

Tom Napier has a big brain. He works as a “Research Architect” for the U.S. Army Corps of Engineers, Engineer Research and Development Center / Construction Engineering Research Laboratory. He has also served as president of the national Building Materials Reuse Association, and is involved in the Design-Build Institute of America and Construction Specifications Institute. Based on his own research, Napier has concluded that reusing materials could reduce the environmental impacts of water use, air and water pollution, and disposal by as much as 99%. “That’s almost a total reduction of adverse impacts compared to manufacturing new items,” Napier says.

State Street warehouse series

State Street warehouse takedown – green demolition aka deconstruction

More and more case studies are being accrued in the green building and demolition industry showing the true viability of these practices, increasing jobs, reducing waste and saving money for contractors and home/building owners.

Tom put out a bucket list of changes that would transform the building industry, boosting the reuse industry and green demolition aka deconstruction into the mainstream. The bucket list was reprinted recently on the ReBuilding Center’s blog, The Reclamation Administration, and we thought it was worthy of reposting as well. The following list contains four of the 6 items. If this gets your gears turning like it does for us, read the rest of the list and his further ideas in the original article on Ecohome, a magazine of the American Institute of Architects

Here’s the list:

  1. The conflict between demolition and deconstruction disappears. The routine is to reuse what can be reused, recycle what can be recycled, and landfill the little bit that’s left.
    “Buildings have to be demolished,” Napier admits. “That’s just a fact of life. What we are trying to do, once a decision is made for a building to come down, instead of the default being to put materials in a landfill or recycling the steel, there are additional avenues of conservation that can be practiced that are not as common as the mainstream. We just want to bring those into the tool kit as well.”
    .
  2. Promoters of “green building” rating systems fully appreciate the impacts of waste and life-cycle benefits of materials reuse, and give full credit to reuse as a major contributor to sustainability.
    “The path of least resistance becomes that which the point chasers exercise,” Napier says. “In a perfect world, there would be some kind of hierarchy—the closest use to the original form gets the most points and the farther you divert, or the more resources you put into making something different, then you get fewer points.”
     .  
  3. Architectural and engineering professionals, as agents to building owners, educate their clients and vigorously promote salvage and reuse where practical.
    In an ideal world, Napier says the value of reused materials would be ingrained in the construction industry infrastructure, starting with academia. “If I were king and I had a really long-term vision, I would be starting back to the educational systems and architectural programs and civil engineering programs and make this part of the value scheme of people coming up in the building professions,” Napier says. “That’s going to take a couple of generations.”
     . 
  4. Deconstruction, salvage, and used material businesses develop a robust and highly visible infrastructure within the building industry. Services are available for any type of project, any time, and at any location.
    According to Napier, this will mean changing up the business model. “When you think about the business model of a demolition contractor, they don’t have a material handling or interim phase between the acquisition of material and the ultimate reuse,” he explains. “Getting those kinds of businesses started and getting them active and working is going to certainly give more options to building owners, property owners, demolition contractors, and designers.”

Read the rest of the list and elaboration on the original article on Ecohome.

What would you like to see to help transform the mountains of construction and demolition trash into reusable materials, green jobs and stewardship of our home?

Posted in: Green business, Reference and resources, Stories about people, Stories about stuff, Transforming the building industry

Leave a Comment (2) →

Deconstructing a House in Five Easy Steps – Notes From the Field

by Ryan DeSales, Seattle Field Crew Member

The RE Store’s Seattle and Bellingham field crews teamed-up this June to deconstruct a house in West Seattle, and yours truly lived to tell the tale.

Yes Virginia, there is a difference between demolition and deconstruction. Conventional demolition operations use heavy equipment to raze a structure. This process typically destroys all reusable building materials, and the resulting debris is sent to the landfill. Deconstruction, on the other hand, is just what it sounds like. A structure is carefully disassembled by hand, or sometimes with the assistance of a machine. This allows most reusable materials (fixtures, flooring, lumber, bricks, etc.) to be salvaged. Anything that can’t be reused is recycled, or disposed of appropriately.

So, how do you deconstruct a house by hand? Just get a couple of experienced and hardworking field crew members of The RE Store and follow these five easy steps:

Step One: Working from the top down, remove shingles and underlayment; toss gingerly from roof while taking care to avoid hitting those working below. Next, remove plywood decking and pull skip sheeting. Repeat as necessary to achieve desired result.

Step Two: Remove all interior fixtures (plumbing and electrical), cabinetry, doors, windows, flooring, and other hardware. Ensure water and electrical power supplies are shut off prior to beginning this step.

Step Three: Working from the interior, pull drywall to expose studs. Working from the exterior, remove all siding to expose plywood sheeting. Next, remove sheeting and wave to crew members working inside.

Step Four: Cut roof trusses and lower to ground level for disassembly. Cut and remove wall studs; do not remove load bearing wall studs prematurely. Repeat until sky is clearly visible overhead.

Step Five: Cut and remove remaining wall studs. Remove flooring material to expose floor joists. Cut and remove joists. Load all salvageable materials onto The RE Store trucks. Dispose of any hazardous materials (fluorescent lights, etc.) appropriately. High five team members accordingly.

You too can deconstruct a house in just eight days using this proven method! Or, you can call up The RE Store in Seattle or Bellingham to learn more about our green deconstruction and salvage services. Seriously though, deconstructing a house by hand requires a tremendous effort by a dedicated group of individuals. The result, however, is well worth it. This West Seattle deconstruction project netted thousands of dollars in salvaged lumber and other building materials that would have otherwise entered the waste stream.

Posted in: Notes From the Field, Stories about people, Stories about stuff, Transforming the building industry

Leave a Comment (2) →
Page 1 of 2 12